After last year’s preparations (a bit of deconstruction, preparing for water and electricity, installing an electric post and reconnecting electricity), this spring we started renovating. I’ve been less regular about pictures so this is an overview of what we’ve been doing.
We stripped the small “porch” of its flimsy wooden covering and window. Given our slow and sometimes unpredictable work progress, we decided to keep the roof on as long as possible (so as not to leave the structure exposed to the elements). We decided to build the new external wall around the existing wood frame. Here is Iulia creating a base of cob on top of which the new earthen wall will be built.


With the frame out of the way we could decide upon the new window location (not what we thought it would be). This required putting in two new posts and removing an existing one:

Meanwhile I was experimenting with the new workshop tools (thickness-planer and table saw – maybe deserves a separate post) to see if I could build a reliably straight and correctly sized window frame (for used windows we got last year) … and I was to get a decent result. After three layers of earthbags … the frame found its place and we continued to build up around it.
We are reprocessing cob by crushing it and remoistening it. We started using the soil from last year’s deconstruction using the cob-pools we also prepared last year. When we finished that soil we started taking down the internal wall … again resuing the materials … so “moving a cob wall”:

and discovered some rotten beams … this one in particular … it had the an electric pole sticking out above it that, I’m guessing, acted as a reliable water collecter that drained above the post.

It is a clear testimony to how tolerant cob is to water (absrobs it, gets stronger with some of it while releasing the rest into the atmosphere) and how intolerant wood is (especially the basic pine we have available to us here).
We reached a point where work on the sacks was becoming uncomfortable … we were crouching and banging our heads on the beams and ceiling. So we decided to take off the roof despite god laughing at us with a 10-day forecast with plenty of rain in it. Iulia’s sister and her partner came out to visit and helped us get the tiles off:

We responded to god’s challenge with plastic tarps which are doing a reasonable job (while also efficiently pooling water). We continued to take the framing apart .. from small to large members:




Then we took off the gutters and peripheral wood sufaces. We still have a ceiling to take down over the internal room (a layer of wood boards covered with a few centimeters of cob) … and then the large beams that go across the entire structure … but that will wait for the weather to clear a bit. Meanwhile we are back to “moving the wall” and loading the cob-pools in preparation for resuming construction: