With the second layer finished we needed to position the inner ends of the ventillation tubes … we had to assemble the corner joints and the parts that oenetrate the wall used cob to continue the slight angle that was already established with the long section of the pipe.

20160818_181046

20160818_181204

The days are getting noticeable shorter, and we felt we wanted to be work longer at the tail end of our evening work sessions … so … lights:

20160821_205436

20160821_205541

After finishing the third level (we are already more than half finished with the 4th) we did some simple level testing and got very good results:

20160826_121411

20160826_121451We are now settling into a continuous flow of work moving endless wheelbarrows of soil … things are moving a bit slower because we are now two people … things to look forward to: wrapping the structure with a moisture barrier, backfilling, electrical installation working higher up, earthbag arches … stay tuned.