Earthbag Cellar Level 8 and 9 and Backfilling

We’ve completed levels 8 and 9 …

20161007_170638

20161007_170717

… on level 9 we were joined by Itsik and Yifat who visited with us for a week … so we reached and celebrated the end of 9 together.

 

img_20161007_165547

In level 9 we also put in additional vertical reinforcement by pounding in rebars into the longest stretch of buried wall that we have (~6 meters)  … and we will continue to do that in an interlaced pattern to give the wall some more strength to resist the weight of the earth piling up behind it.

20161006_175508

Which brings us to today … soil … we called the excavator back (marking what is probably the half-way point of wall construction) … to start backfilling and bringing some more soil to our mixing station (so that I don’t need to carry it in a wheelbarrow). Yesterday we prepared by pulling the plastic covering over the walls   20161010_095944

.. and so it started … and very quickly the corner behind the first retaining wall was filled up ….

20161010_104143

… then the side and rear corner20161010_110123

… during the backfilling, a new soil pile near the mixing station started to appear

20161010_114644

20161010_112433

… and before you know it (almost three hours later) the backfilling was complete …. so from the outside we are back at ground level (which does make some maneuvering on the walls easier)

20161010_130658

… and a huge pile of soil (30+ cubic meters) is now blocking the entrance and hiding the site … when that soil is gone, construction of the walls should be complete (or very close to completion)

20161010_132454

As the work progressed we realized we were going through A LOT (= surprising amount) of soil … we’ve used up most of the free soil on and around the site … and it doesn’t look like what we have left will be enogh to complete backfilling and covering the structure. At first this felt like a potential problem … but it quickly transformed into opportunity. It looks like the supply of soil needed to complete this project will overlap and lead into the next project. One option weve been discussing is a small lake (a whole other story). Another option is to start excavating what may be the next construction project … either way … it left us with a pleasant sense of continuity 🙂